Concrete Calculator
Use the Concrete Calculator to estimate slab, footing or other selected pour volume; review units, allowance and bag-yield assumptions.
Volume Calculator
Select a 3D shape and enter its measurements.
Enter any two spherical-cap measurements. The calculator derives the third.
Enter both water-level readings using the same volume unit. The difference is the object's displaced volume.
For ft / in, enter values such as 5 ft 6 in. For m / cm, enter values such as 1 m 25 cm. You can also enter a decimal value in the larger unit.
Micrometers, nanometers and angstroms are available for very small-scale measurements.
Enter positive measurements. Results update when you calculate.
Calculate a result to rate this tool.
Multiply the length, width and height using the same measurement unit.
Step-by-step calculation
- Enter your dimensions to see the calculation steps.
Concrete quantity formula and measurements
Estimate geometric concrete volume for the selected project using its labeled measurements. Convert thickness and other dimensions consistently before ordering. Waste allowance, bag yield and supplier requirements are separate from the exact geometric volume.
Geometric volume × quantity; order volume includes the entered allowance
Required inputs: Project geometry; dimensions with individual units; whole-number quantity; waste allowance; optional density, bag yield and price.
How to use this calculator
- Choose the calculation method that matches the measurements you know.
- Enter project geometry; dimensions with individual units; whole-number quantity; waste allowance; optional density, bag yield and price.
- Choose the units beside each input. Area and known-volume fields have their own units; a thickness in inches must not be treated as feet.
- Select Calculate volume and review any error message, conversions and calculation steps.
- Check the result against the model assumptions below before using it for a project.
Worked example

A 10 ft × 10 ft slab, 4 in thick, has 33.3333 ft³ = 1.2346 yd³ before allowance. At 8% waste the order estimate is 36 ft³ = 1.3333 yd³.
Available calculation options
These options match this page’s method controls. Selecting one changes the measurements or geometry used by the tool.
| Available option | Inputs / calculation |
|---|---|
| Slabs, Square Footings, or Walls | V = length × width × thickness × quantity. |
| Hole, Column, or Round Footings | V = π(D/2)² × height × quantity. |
| Circular Slab or Tube | V = π(D² − d²) × height × quantity / 4. |
| Curb and Gutter Barrier | V = (curb depth × curb height + gutter width × flag thickness) × length × quantity; the cross-sections must not overlap. |
| Stairs | V = width × rise × [run × n(n+1)/2 + platform depth × n] × quantity. |
Assumptions and limits
The output is a quantity estimate, not a structural design. Quantity and riser count must be whole numbers. For tube geometry the outer diameter must exceed the inner diameter. Stairs assume solid equal steps and a full-height platform; this is not the formula for an open stair or a thin inclined stair slab. Density and bag yield are user assumptions, and price is per US short ton where provided.
Units and accuracy
Lengths use linear units, areas use squared units and volumes use cubed units. For example, 1 m³ = 1,000 L; 1 ft³ = 1,728 in³; and 1 yd³ = 27 ft³. US and imperial gallons differ, so use the correctly labeled output. A conversion does not improve measurement accuracy.
Keep unrounded measurements during the calculation and round the final result to suit the measurements. Very small nonzero results may use scientific notation to avoid displaying a misleading zero.
Questions about this tool
Why can my real measurement differ from the answer?
The output is a quantity estimate, not a structural design. Quantity and riser count must be whole numbers. For tube geometry the outer diameter must exceed the inner diameter. Stairs assume solid equal steps and a full-height platform; this is not the formula for an open stair or a thin inclined stair slab. Density and bag yield are user assumptions, and price is per US short ton where provided.
Can I change the input units?
Use the units beside the relevant fields. Check the field labels again after changing method or units.
How do I report an incorrect result?
Use Contact Us and include the page URL, selected method, input values, units and expected result. The contact form opens your email application; do not include sensitive information.
Start with the actual pour geometry
For a rectangular slab, use length × width × thickness. Check the selected project type before entering measurements: a round footing and a rectangular slab use different models. Divide complex pours into non-overlapping sections.
A practical calculation
A slab 5 m long, 3 m wide and 0.1 m thick needs 1.5 m³ geometrically. A separate 5% allowance makes the estimate 1.575 m³. The suitable allowance depends on excavation, forms and supplier guidance.
Volume does not establish structural suitability
Concrete strength, reinforcement, ground conditions and design requirements are outside this calculator. Confirm ordering units and usable bag yield with the supplier.
Read our calculation methods, unit references and accuracy limits.
Available calculator controls
Enter each measurement in its own unit and choose a cubic or liquid output unit. For radius-based shapes, the diameter option converts the entered width to radius. The steps and diagram use the main input unit.
Copy the result, print the calculation or copy a calculation link to reopen the same measurements. The advanced panel can solve a supported missing dimension, add or subtract two simple solids, and estimate mass from a density you supply. Combined shapes must satisfy the stated overlap and containment assumptions.
Summary
Use the Concrete Calculator to estimate slab, footing or other selected pour volume; review units, allowance and bag-yield assumptions.
- Concrete Calculator
- concrete volume
- slab thickness
- pour quantity